Graduate Students Supervised

M.Eng. Students

  1. James Schweitzer Micro-strategic Project Planning Procedure at Moore Research Center (April 24, 2000).
  2. Frank Tarantello, Jr. Waste Operations Technical Support’s Strategic Plan Blueprint (April 25, 2000).
  3. Witawat Wattanapanom Productivity Improvement by Upstream Downtime Reduction at Motorola, Inc. (May 4, 2001).
  4. Sang Ho Joeng Imbalance of V7 Compressors at Delphi Thermal Systems (May 4, 2001.)
  5. Chandan Nambiar Root Cause Analysis of Engineering Defects (May 4, 2001).
  6. Juan Pablo Cabrera-Barreneche Web-Enabled Supply Chain Management of Engineered Parts (May 4, 2001).
  7. Chaiphat Karavavattana Activity-Based Costing: Model and Value (December 4, 2001).
  8. Paul Clark Requirements and Decision Making Processes Surrounding a Potential Vendor Change for Packaging Components in a Pharmaceutical Environment (April 25, 2002).
  9. Mike Wirth Lean Material Movement through Manufacturing Cells (April 25, 2002).
  10. Dick Agustiady Damage Reduction in Header Tube and Center (HTC) Condenser Core Area (April 25, 2002).
  11. Faisal Abu Zahra Decentralization of Product Packaging Operations at Delphi Thermal Systems (September 1, 2002).
  12. Brian M. Drake Competitive Edge of Customized Data Collection Serving Customer Needs (May 7, 2002).
  13. Fui-Ken Liew Operational Availability Improvement on Evaporator Auto Stacking Machine at Delphi Harrison Thermal Systems (August 21, 2003).
  14. David Bilson E-Transformation of Selected Operations (May 6, 2003).
  15. Juan Esteban Campuzano Engineering Management of Global Production Systems (May 6, 2003).
  16. Rucha Gokhale Improving Marketing Effectiveness of an IT Service Firm (February 1, 2004).
  17. Mark Kolwalczyk Design and Implementation of a Bar Code System at Buffalo Wire Works (February 1, 2004.)
  18. Alann P. Au Backlog Reduction and Process Improvement of Passenger Mask Assembly (February 1, 2004).
  19. Kevin McGrogan Plant Facilities Improvement at AccuMed Technologies (February 1, 2004).
  20. Mark Towers Implementing Oracle ERP at MedSource Orchard Park (August 27, 2004).
  21. Todd Heath Implementation of SQL Server 2000 Reporting Services at HCA Physician Services (December 10, 2004).
  22. Steve Kerwin Material Plan for UltraLoc Sub-Assemblies at Enidine, Inc. (December 10, 2004).
  23. Ram Prakash Suryanarayna Order Information Pull System: Design & Implementation for U-Tube Heat Exchangers (ITT Industries, Inc., NY) (December 10, 2004).
  24. Mark Hejmanowski Activity Based Costing at Buffalo Wire Works (December 10, 2004).
  25. Jeffrey Morrow Production Planning Optimizer for a Hydrogen and Carbon Dioxide Facility (May 6, 2005).
  26. Jahangir Shah Business Analysis and Process Improvement at Thruway Fasteners Inc. (May 6, 2005).
  27. Robert Kapilevich Developing an Ergonomics Strategy for a Tier I Automotive Supplier (May 6, 2005).
  28. Steve Cena Cost Reduction for the Production of an Integrated Valve and Pressure Regulator Through Process Improvements of Assembly, Test and Packaging Operations (December 8, 2005).
  29. Shirlee Sooklee Tang Implementation of Flow Manufacturing System Design (FMSD) for the Launching of 1.2 Air Meter Operations at Delphi Automotive Systems (November 8, 2005.
  30. Sandhya Sundar Lean Manufacturing at Ductmate Industries, Inc. (December 8, 2005).
  31. Nagesh Allada Process Improvement of Automated Cutting Machine – Eastman Machine Company (December 10, 2005).
  32. Brian McAvoy Reduction of Parts Warranty Expenses at Husky (December 19, 2005).
  33. Thomas McNamara Entrepreneurship and Business Planning (May 11, 2006).
  34. Manual Pena Fast Flow Using a Crossdock and Milkruns (May 6, 2006).
  35. Keton Prabhakar Shenoy Improvement in Coil Winding Process at Luvata (Formerly Outokumpu American Brass) (August 24, 2006).
  36. Jeff Josepf Delphi Automotive Systems – Thermal Division ‘Right-Sizing’ Gage Calibration System (August 24, 2006).
  37. Amit Kathuria Improvement of Project Timelines at Fenevations LLC (November 1, 2006).
  38. Sunny Vaid Preparing Software Development Project Plan for Genome International Corporation (November 7, 2006).
  39. Virat Damania Value Stream Mapping and Process Improvement of Left Ventricular Assist Device at Greatbatch, Inc. (December 7, 2006).
  40. Christian Impellitier Process Improvement at Nitram Incorporated (December 7, 2006).
  41. Mylinda J. Snyder Product Development Program Development and cost Reduction of an A160 Accessory Module at Hebeler Corporation (January 12, 2007).
  42. Jane Schweizer Efficiency Improvement of Titanium Manufacturing Operations (May 3, 2007).
  43. Gunvanti Marathe Process Improvement of Logistical Procedures at C. H. Robinson Worldwide, Inc. (August 23, 2007).
  44. Gautam Kundra Designing A Transportation Network and Optimized Operating Plan for GM Hummer Assembly Plant (August 23, 2007).
  45. Deepika Vij Development of an Early Warning Bin System Triggered by Manufacturing Failure Modes at Delphi Thermal Systems (December 10, 2007).
  46. Ashith Hegde Improving Plant Operations Using Group Technology at Nuttall Gear, Niagara Falls, NY (December 10, 2007).
  47. Stephen M. Grisnati MFS emergency Department Patient Throughput and Operational Efficiency Initiative (ED Length of Stay) (September 5, 2008).
  48. ChongGang Zhong Improve Plant Layout and Cut Room OEE by Applying Value Stream Mapping at AccuMed (December 3, 2008).
  49. Karankumar Vaidya Setup Time Reduction on Injection Molding Press at Delphi Thermal Systems (December 3, 2008).

M.S. Students in Service Engineering

  1. Tonmoy Bhattachaarya Electronic Banko Sentral Registration Documentation Department Automation Program at HSBC Securities Services (August 11, 2008).
  2. Swannad Ajit Naravane Customer Performance Analysis and Business Process Improvement and Insafe Ltd. (December 3, 2008).
  3. Sandeep Anantharaman Workflow Management Console for Service Systems at IBM (August 16, 2008).
  4. Sandeep Anantharaman Workflow Management Console for Service Systems at IBM (August 19, 2008).
  5. Sagar S. Rahurkar General Console For Service Systems at IBM Research Labs (August 16, 2008).
  6. Ruofan Xu Integrate Order Entry Systems to Manhattan Associates’ Integrated Logistics Solution Systems (August 11, 2008).
  7. Ravi Paleiya Automatic Phone Banking System (December 3, 2008).
  8. Pranay Singh Digitalization of Faculty Annual Reports (August 11, 2008).
  9. Vinny Kumar Anipindi Healthcare Improving the Emergency Room (July 27, 2009).
  10. Rama Krishnan Hariharan Hadoop Acronym Miner at IBM Research Labs (August 19, 2009).
  11. Maisha N. Asha Data Collection and Analysis Assignments at Curbell Electronics (May 1, 2009).
  12. Elif Koc Nutrition Advisor for Web-based healthcare Systems (May 1, 2009).