 |
• Information Fusion
• Congestion in Facilities Location and Layout
• Facility Layout (Re)Design
• Agile Manufacturing
• Real-Time Visualization
• Sensor Networks
• Facilities Design and Cellular Manufacturing
• Operations of Production Systems
• Variant Design
• IE 684: Networks, Routing, and Logistics
• IE 661: Scheduling Theory
• IE 620: Agile Manufacturing
• IE 505: Production Planning and Control
• IE 504: Facilities Design
• IE 500: Special Topics: Logistics and Supply-Chain Management
• IE 327: Facilities Design
• IE 320: Engineering Economy
|
 |
 |
 |
Operation of Production Systems
Rakesh Nagi's Research Page
•Description
•Grant Support
•Personnel
•Papers and Talks
Description |
|
In the wake of recent global competition and pressures to reduce
cycle-time, factories need to not only be well designed but should also be
planned and scheduled for efficient production. Industrial production histories
indicate that it is not uncommon for most parts spend about 80-90% of their
time waiting in buffers/queues for machines or material handling equipment,
and usually only a small 5-10% of their time on the shop-floor in actual
machining. This is largely attributed to inefficient production planning
and scheduling decisions.
- Just In Time Production of Multi-Level Assemblies:
This research is has produced a class of finite capacity Just-In-Time production
planning/scheduling methods for assembled products in a batch manufacturing
environment (similar to MRP, but CAPACITATED!). Integrated lot-sizing and
scheduling has been researched. Simultaneous scheduling of material handling
transporters (such as Automatic Guided Vehicles or AGVs) and manufacturing
equipment (such as machines and workcenters) has also been researched. The
benefit of integration has been demonstrated.
-
Performance Evaluation and Modeling: Modeling
and analysis of complex manufacturing systems and other discrete-event systems
could be costly, both in computational and developmental terms. Efficient
gradient estimation methods for sensitivity analysis and optimization via
simulation has been an area of interest.
- Production Planning, Management and Control of a production
system subject to random events are challenging problems. A multi-layer hierarchical
approach to tactical and aggregate production planning problems was developed,
wherein the architecture is strongly dependent on the specific physical system,
applicable controls and the complexity of the decision making problem at
hand. This work is mostly summarized in two book chapters and several conference
papers.
|
Grant Support |
|
- "Scheduling to Minimize Stringer Utilization," Outokumpu American
Brass, Buffalo, NY with SPIR/TCIE; $32,381 (March 2003 – August 2003); Two
students supported.
- "Knowledge Acquisition and Scheduling System Design," Carborundum
Corporation, Amherst, NY with SPIR/TCIE; $88,299 (July 2000 – May 2001);
Three students supported.
- "Operational Analysis and Facility Redesign Studies," Republic
Drug Company, Buffalo, NY with SPIR/TCIE; $13,534 (May – July 1999); Two
students supported.
- "Operational Analysis and Facility Design Studies," Imaging
and Sensing Technology, Horseheads, NY with SPIR/TCIE; $17,042 (October –
December 1998); Two students supported.
- "Operational Assessment: Facility Layout and Process Flow,"
Milward Alloys Inc., Lockport, NY with SPIR/TCIE; $10,239 (August – September
1998); One students supported.
- "Time Studies, Process Flow and Inventory Control," McKenica
Corp., Buffalo, NY with SPIR/TCIE; $15,671 (July – August 1998); Two students
supported.
- "Layout and Productivity Improvements at AVX Corporation,"
AVX Corp., Myrtle Beach, SC through TCIE; $4,409; co-PI L. Lin (June 1997).
- "Briquetting Productivity and Automation Enhancement," Manitoba
Corp., Lancaster, NY through SPIR; $5,128 (December 1996 - January 1997).
One student supported for one winter month.
- "Fuzzy Framework for Multi-Resource Multi-Project Management,"
RDF fund, SUNY at Buffalo, Department of Industrial Engineering; $2,250 (November
1994 - September 1995). One graduate student supported.
- "Operational Assessment at Premier Image," Premier Image,
Buffalo, NY through TCIE; $1,095 (March 1994).
- "Optimal Facility Design and Cycle Time Reduction for Antenna
Assembly," Investigator, $137,175 project funded by Westinghouse Corporation
and MIPS, (Phase I : August 1991 - July 1992) (PIs Drs. G. Harhalakis and
I. Minis at University of Maryland).
- "Optimal Facility Design and Cycle Time Reduction for Antenna
Assembly," Investigator, $143,015 project funded by Westinghouse Corporation
and MIPS, (Phase II : August 1992 - July 1993) (PIs Drs. G. Harhalakis and
I. Minis at University of Maryland).
|
Personnel |
|
Doctoral Students
- Muhammad F. Anwar; Graduated 9/00. Dissertation
title: "Integrated Transportation System and Workcenter Scheduling." Starting
position: Assistant Professor, University of Memphis, TN.
- Ana Maria Sarmiento; Graduated 1/01. Dissertation title: "An
Integrated Production-Logistics Approach to Partner-Chain Design in Agile
Manufacturing." Recipient of the 1998 Doctoral Dissertation Proposal Award
of Society of Logistics Engineers/International Society of Logistics. Starting
Position: Manager I2 Technologies, Dallas TX.
- Luis Sanchez; Graduated 7/02. Dissertation title: "Location,
Sizing and Production Allocation with Fixed and Mobile Manufacturing Facilities"
Starting position: Director of Engineering and Science Department, ITESM
Leon Campus, Mexico.
- Chaewon Bang; Graduated 1/03. Tentative dissertation title: "A
Hybrid Integrated Approach for Process Planning and Shop-Floor Scheduling
in Agile Manufacturing." Starting position: General Manager of CIM, Hyundai
Information Technology, Co., Ltd., Seoul, S. Korea.
- Alfred Guiffrida; expected graduation 5/05. Tentative dissertation
title: "A Cost-Based Model for Evaluating Supply Chain Performance."
MS Students
- Muhammad F. Anwar; graduated 8/95. Thesis title: "Just-In-Time
Production of Complex Assemblies with Finite Set-up Costs." Pursued a Ph.D.
degree at SUNY-Buffalo.
- Vallish Shankar; graduated 7/96. Thesis title: "A Flexible Optimization
Approach to Multi-Resource, Multi-Project Planning and Scheduling." Currently
at Coopers and Lybrand, Chicago, IL.
- Sumiathangi Sriram; graduated 8/98. Thesis title: "A Hierarchical
and Dynamic Distribution System for Agile Manufacturing based on Distributed
Object Technology." Currently at I2 Technologies, Dallas, TX.
- Milind Mehere; graduated 8/98. Thesis title: "Integrated Distribution
System Design with Warehouse Location and Logistics." (co-advised with Joyendu
Bhadury). Currently at I2 Technologies, Cambridge, MA.
- Siddharth Batra; graduated 8/98. Thesis title: "Integrating Order
Picking and Sortation in Warehouse Distribution Systems." Currently at 3Com,
Santa Clara, CA.
- Ya-Ming Shiue; graduated 11/98. Thesis title: "A Decision Support
Tool for Selecting and Sequencing Regularly Visited Customers in Courier
Routing." (co-advised with Christopher Rump). Currently at Xerox, Rochester,
NY.
- Osman Kazan; graduated 12/98. Thesis title: "New Lot-Sizing Formulations
for Less Nervous Production Schedules." (co-advised with Christopher Rump).
Currently at Dopkins and Co., Buffalo, NY.
- Kristen Wen; graduated 1/99. Thesis title: "Unit Cost Reduction
through a Dynamic Staffing System for Unreliable Transfer Lines." Currently
Manufacturing Engineer at GM Powertrain, Tonawanda, NY.
- Balaji Venkatesan; graduated 6/99. Thesis title: "An IT-OR Approach
to Project Management in an Agile Manufacturing Environment." Currently at
I2 Technologies, Cambridge, MA.
- Alfred Guiffrida; graduated 8/99. Thesis title: "A Cost-Based
Model for Evaluating Vendor Delivery Performance." Currently pursuing a Ph.D.
degree at University at Buffalo.
- Parag Kulkarni; graduated 8/99. Thesis title: "Effect of batch
move size on Just-In-Time production of Multi-level Assemblies." Currently
at Microstrategy, Vienna, VA.
- Amol Adgaonkar; graduated 10/99. Thesis title: "Multiperiod Newsvendor
Model with Forecast Update;" (co-advised with Ram Akella). Currently at I2
Technologies, Dallas, TX.
- Amol Amritkar; graduated 12/99. Thesis title: "Impact of Heijunka
(Level Scheduling) on Internal Supply Chain Management in JIT Manufacturing
Environment." Currently at I2 Technologies, Dallas, TX.
- Sanjay Ramanujan; graduated 1/01. Thesis title: "Decision Support
System for Integrated Assembly Plan Generation and Task Scheduling." Currently
at ILOG, Mountainview, CA.
- Ashwin Warrier; graduated 8/01. Thesis title: "A Decision Support
Tool for the Inventory Allocation and Vehicle Routing Problem." Currently
at SCT Corp. (supply-chain consulting), Philadelphia, PA.
- Abhay Joshi; graduated 8/03. Thesis title: "Reactive Scheduling
in Workflow Management Systems: A Branch-and-Price Approach." Currently pursuing
PhD at University at Buffalo.
- Satyaki Ghoshdastidar; graduated 8/03. Thesis title: "Hierarchical
Production Scheduling of Parallel Machines in the presence of Multiple Tooling
and Resource Constraints and Sequence-Dependent Setup Times: Applications
in Injection Molding Operations." Currently pursuing PhD at University at
Buffalo.
- Sachin Mujawar; graduated 8/04. Thesis title:
"Scheduling to Minimize Stringer Utilization for Continuous Annealing Operations."
Starting position, Research Engineer at FM Global, Boston/Norwood, MA.
|
Papers and Talks
|
|
Journal Papers:
- Guiffrida, A.L. and Nagi, R. "Cost Characterizations of Supply Chain Delivery Performance," accepted to International Journal of Production Economics, January 2005. Download(PDF)
- Ghosh Dastidar, S. and Nagi, R. "Batch Splitting in an Assembly Scheduling Environment," accepted to International Journal of Production Economics, November 2004. Download(PDF)
- Ghosh Dastidar, S. and Nagi, R., "Scheduling Injection Molding Operations with Multiple Resource Constraints and Sequence Dependent Setup Times and Costs," Computers & Operations Research, 2005, Vol. 32(11), pp. 2987-3005.
Download(PDF)
- Chauhan, S., Nagi, R. and Proth, J.-M. "Strategic Capacity Planning in Supply Chain Design for a New Market Opportunity," International Journal of Production Research, 2004, Vol. 42(11), pp. 2197 - 2206. Download(PDF)
- Agrawal, A., Minis, I. and Nagi, R., "Cycle Time Reduction by Improved MRP-based Production Planning," International Journal of Production Research, 2000, Vol. 38(18), pp. 4823-4841. Download(PDF)
- Kazan, O., Nagi, R. and Rump, C., "New Lot-Sizing Formulations for Less Nervous Production Schedules," Computers & Operations Research, 2000, Vol. 27(13), pp. 1325-1345. Download(PDF)
- Tung, L.-F., Lin, L. and Nagi, R., "Multiple-objective Scheduling for the Hierarchical Control of Flexible Manufacturing Cells," International Journal of Flexible Manufacturing Systems, 1999, Vol. 11(4), pp. 379-409. Download(PDF)
- Sarmiento, A.-M. and Nagi, R., "Recent Directions in Integrated Analysis of Manufacturing-Distribution Systems," IIE Transactions on Scheduling and Logistics, special issue on Manufacturing Logistics, 1999, Vol. 31(11), pp. 1061-1074.
Download(PDF)
- Guiffrida, A.L. and Nagi, R., "Fuzzy Set Theory Applications in Production Management Research: A Literature Survey," Journal of Intelligent Manufacturing, 1998, Vol. 9(1), pp. 39-56. Download(PDF)
- Anwar, M.F. and Nagi, R., "Integrated Scheduling of Material Handling and Manufacturing Activities for Just-In-Time Production of Complex Assemblies," International Journal of Production Research, 1998, Vol. 36(3), pp. 653-681. Download(PDF)
- Shah, M., Lin, L. and Nagi, R., "A Production Order-driven AGV Control Model with Object-oriented Implementation," Computer Integrated Manufacturing Systems, 1997, Vol. 10(1), pp. 35-48. Download(PDF)
- Anwar, M.F. and Nagi, R., "Integrated Lot-sizing and Scheduling for Just-In-Time Production of Complex Assemblies with Finite Set-ups," International Journal of Production Research, 1997, Vol. 35(5), pp. 1447-1470. Download(PDF)
- Roach, A. and Nagi, R., "A Hybrid GA-SA Algorithm for Just-In-Time Scheduling of Multi-level Assemblies," Computers & Industrial Engineering, special issue on Genetic Algorithms in Industrial Engineering, 1996, Vol. 30(4), pp. 1047-1060.
- Agrawal, A., Harhalakis, G., Minis, I. and Nagi, R., "Just-In-Time Production of Large Assemblies," IIE Transactions on Scheduling and Logistics, 1996, Vol. 28, pp. 653-667.
- Fu, M.C., Hu, J.-Q. and Nagi, R., "Comparison of Gradient Estimation Techniques for Queues with Non-Identical Servers," Computers & Operations Research, 1995, Vol. 22(7), pp. 715-729.
- Fu, M.C., Hu, J.-Q. and Nagi, R., "Bias Properties of Infinitesimal Perturbation Analysis for Systems with Parallel Servers," Computers & Operations Research, 1991, Vol. 19(5), pp. 409-423.
- Nagi, R. and Proth, J.M., "Production Management Architecture," The Industrial Electronics Handbook, Editor in Chief: D. Irwin, pp. 653-662, CRC Press LLC, Florida, 1997. ISBN 0-8493-8343-9. (Refereed Book Chapter)
- Nagi, R. and Proth, J.M., "Hierarchical Production Management," Modern Manufacturing: Information Control and Technology, Editors: M. Zaremba and B.P. Prasad, pp. 132- 172, Springer-Verlag London, 1994. ISBN 0-387-19890-3. (Refereed Book Chapter)
Conference Papers (Full Paper Reviewed):
- Sanchez, L.M. and Nagi, R., "Capacity Planning with Fixed
and Mobile Facilities," 12th Industrial Engineering Research Conference,
Portland OR, May 2003.
- Sanchez, L.M. and Nagi, R., "Location and Production Allocation
of Fixed and Mobile Manufacturing Facilities," 11th Industrial Engineering
Research Conference, Orlando FL, May 2002.
- Guiffrida, A. and Nagi, R., "A Cost-Based Model for Evaluating
Supply Chain Performance," 29th International Conference on Computers
and Industrial Engineering, Montreal Canada, November 2001, pp. 233-239.
- Anwar, M.F. and Nagi, R., "Integrated Conflict Free Routing
of AGVs and Workcenter Scheduling in a Just-In-Time Production Environment,"
6th Industrial Engineering Research Conference, Miami, FL,
May 1997, pp. 216-221.
- Anwar, M.F. and Nagi, R., "Integration of Just-In-Time production
and Material Handling in an Assembly Environment," 5th Industrial Engineering
Research Conference, Minneapolis, MN, May 1996, pp. 281-286.
- Shankar, V. and Nagi, R., "A Flexible Optimization Approach
for Multi-resource, Multi-project Planning and Scheduling," 5th Industrial
Engineering Research Conference, Minneapolis, MN, May 1996, pp. 263-267.
- Harhalakis, G., Lin, C.P., Nagi, R. and Proth, J.M., "Hierarchical
Decision Making in Computer Integrated Manufacturing Systems," Rensselear's
Third International Conference on CIM, Troy, NY, May 20-22 1992.
- Harhalakis, G., Nagi, R., Proth, J.M. and Vernadat, F., "Design
of Manufacturing Systems: A Bottom-up Approach Based on Petri Nets," Third
International Conference on Data and Knowledge Systems for Manufacturing
and Engineering, Lyon-France, March 1992.
- Harhalakis, G., Nagi, R. and Proth, J.M., "Hierarchical Modeling
Approach for Production Planning," INCOM '92: 7th IFAC Symposium on Information
Control Problems in Manufacturing Technology, Toronto, May 25-28 1992.
Conference Papers (Full Paper, Abstract Reviewed):
- Panikacherry, B.N. and Nagi, R., "An Integrated Framework
For Distributed Scheduling And Logistics Management In Agile Manufacturing,"
8th Industrial Engineering Research Conference, Phoenix AZ,
May 1999.
- Venkatesan, B. and Nagi, R., "An IT-OR Approach to Project
Management in an Agile Manufacturing Environment," 8th Industrial Engineering
Research Conference, Phoenix AZ, May 1999.
- Bang, C. and Nagi, R., "An Integrated Framework for Process
Planning and Shop Floor Scheduling in Agile Cellular Manufacturing," 8th
Industrial Engineering Research Conference, Phoenix AZ, May 1999.
- Kazan, O., Nagi, R. and Rump, C., "New Lot-Sizing Formulations
for Less Nervous Production Schedules," 8th Industrial Engineering Research
Conference, Phoenix AZ, May 1999.
- Venkatesan, B. and Nagi, R., "Decision Support System for
Logistical and Assembly Analysis of Rapidly Reconfigurable Complex Assemblies
in an Agile Manufacturing Environment," Rensselaer’s International Conference
on Agile, Intelligent, and Computer-Integrated Manufacturing, Troy, NY,
October 1998.
- Anwar, M.F. and Nagi, R., "Integrated Scheduling and Logistics
in an Assembly Environment," Rensselaer’s International Conference on
Agile, Intelligent, and Computer-Integrated Manufacturing, Troy, NY, October
1998.
- Sriram, S.R. and Nagi, R., "A Hierarchical and Dynamic Distribution
System for Agile Manufacturing based on Distributed Object Technology,"
Rensselaer’s International Conference on Agile, Intelligent,
and Computer-Integrated Manufacturing, Troy, NY, October 1998.
- Sriram, S.R. and Nagi, R., "An Information Technology-Based
Dynamic Distribution System for Agile Manufacturing," 7th Industrial
Engineering Research Conference, Alberta Canada, May 1998.
- Sarmiento, A.-M. and Nagi, R., "Partnership Selection for
Virtual Enterprises from Organizational Webs," 7th Industrial Engineering
Research Conference, Alberta Canada, May 1998.
- Sarmiento, A.-M. and Nagi, R., "Analysis of a Two-Level Integrated
Production-Distribution System," 1996 Conference on Agile and Intelligent
Manufacturing Systems, Troy, NY, Oct. 1996.
Conference Presentations:
- Joshi, A. and Nagi, R., "Reactive Scheduling in Workflow Management
Systems: A Branch-and-Price Approach," invited (sponsored by Manufacturing,
Services and Operations Management cluster) presentation in the INFORMS
Fall 2003 Conference, Atlanta GA, October 2003.
- Anwar, M.F. and Nagi, R., "Lagrangean Relaxation Based Solution
Approach for Integrated Material Handling System and Workcenter Scheduling,"
10th Industrial Engineering Research Conference, Dallas
TX, May 2001.
- Anwar, M.F., Batta, R. and Nagi, R., "Improved Integrated
Scheduling & Logistics in an Assembly Environment using Concepts from
Column Generation," invited presentation in the INFORMS Fall 2000 Conference,
San Antonio, November 2000.
- Sarmiento, A.-M. and Nagi, R., "A Simulation Study of Manufacturing
Supply Chains Cost under Demand Variations," presented in the INFORMS
Fall 2000 Conference, San Antonio, November 2000.
- Sarmiento, A.-M. and Nagi, R., "A Modified Benders Approach
as Lower Bound for Manufacturing Supply Chains Cost," presented in the INFORMS
Fall 2000 Conference, San Antonio, November 2000.
- Anwar, M.F. and Nagi, R., "A Column Generation Approach for
Integrated Scheduling and Logistics of Assemblies," invited presentation
in the INFORMS Fall 1999 Conference, Philadelphia, November 1999.
- Mehere, M., Bhadury, J. and Nagi, R., "Integrated Distribution
System Design with Warehouse Location & Logistics," presented in the
INFORMS Spring 1999 Conference, Cincinnati, May 1999.
- Kazan, O., Nagi, R. and Rump, C., "New Lot-Sizing Formulations
for Less Nervous Production Schedules," presented in the INFORMS Spring
1999 Conference, Cincinnati, May 1999.
- Sarmiento, A.-M. and Nagi, R., "An analytical tool to support
the selection of partners from Organizational Webs in Agile Manufacturing,"
presented in the INFORMS Spring 1999 Conference, Cincinnati, May 1999.
- Sarmiento, A.-M. and Nagi, R., "Neural Network-based batch
scheduling for an integrated agile production-distribution system," invited
presentation in the INFORMS Fall 1998 Conference, Seattle, WA, October
1998.
- Anwar, M.F. and Nagi, R., "Integrated Scheduling of AGVs and
Workcenters with the Consideration of Conflict Free Routing," invited presentation
in the INFORMS Spring 1998 Conference, Montreal Canada, April 1998.
|
|